Launching of a 32'' twin pipeline, 900m in length, using the underwater pull method at the new offshore MBM mooring. Installation of concrete mattresses along the route for anchor protection.
Depth: -50m
SUB CONTRACTOR
ARCHIMIDES A.T.E. / MOTOR OIL (HELLAS)
Installation of custom roller frames (5x3m) inside the trench along the pipeline route. Placement of geotextiles and backfilling with seabed preparation materials.
Depth: -50m
SUB CONTRACTOR
ETME-PEPPAS & ASSOCIATES E.E.
FloatMastBlue Project: Underwater cutting and recovery of components (Lever Arm, SLAMC, Elastomeric Bearings) from the TLP platform.