Projects 2015 - 2018

REGION OF CENTRAL MACEDONIA (2018)

Artificial Reef Construction: Deployment of over 300 cellular and solid concrete blocks of various dimensions, and installation of light beacons.

SUB CONTRACTOR

PUBLIC POWER CORPORATION S.A. (PPC) / TERNA / CH. KONSTANTINIDIS (2017)

Pipeline and Mooring Installation: Laying of a 16'' HFO steel pipeline (800m), Φ450 and Φ280 HDPE pipelines, and concrete mattresses, along with connection to the PLEM.

SUB CONTRACTOR

ARCHIMIDES A.T.E. / ENERGEAN OIL-GAS (2015)

Drilling Rig Mooring (Energean Force): Deployment of seven (7) 200T articulated blocks, anchors, and connection of Φ100 chains to the mooring buoys.

SUB CONTRACTOR