Projects 2015 - 2018
REGION OF CENTRAL MACEDONIA (2018)
Artificial Reef Construction: Deployment of over 300 cellular and solid concrete blocks of various dimensions, and installation of light beacons.
- Depth: -25m
SUB CONTRACTOR








PUBLIC POWER CORPORATION S.A. (PPC) / TERNA / CH. KONSTANTINIDIS (2017)
Pipeline and Mooring Installation: Laying of a 16'' HFO steel pipeline (800m), Φ450 and Φ280 HDPE pipelines, and concrete mattresses, along with connection to the PLEM.
- Depth: -25m
SUB CONTRACTOR







ARCHIMIDES A.T.E. / ENERGEAN OIL-GAS (2015)
Drilling Rig Mooring (Energean Force): Deployment of seven (7) 200T articulated blocks, anchors, and connection of Φ100 chains to the mooring buoys.
- Depth: -35m
SUB CONTRACTOR








